We recently added new stonework on #8 cart path between the green and the cart path. We added this stone to relieve the stressed out area from traffic and moisture. There are other areas on this hole that have been utilized with such stone work so it will continue to be consistent and helpful for traffic and moisture control.
Before adding stone, we identified where the highest level of traffic was and painted a line where we wanted work to be completedFabian, our irrigation tech, is adding stone to the high traffic area as tight as we can possibly fit them together. We made the stone level with the cart path and level with the turf on the north side of the cart path.
We have finished adding stone and sand to the area. We still have a little bit left to do within the blue line, but we plan on finishing this soon.